Checklist of inspections
The complete monitoring of a wind turbine through regular maintenance, inspection and repair, as well as regular independent appraisals, are prerequisites for ensuring the best possible operational safety.
Find out here which mandatory inspections are due in which operating year of your wind turbine
Required safety checks
according to Standards
- LoremIpsum
- LoremIpsum
- LoremIpsum
- LoremIpsum
- LoremIpsum

Commissioning WEA
on commissioning
Winches, lifting and pulling equipment
annual
Drive-on systems/lift (ZüS)/IBN/Z/H
annual
Security technology
annual
This applies to the testing of ladders, climbing protection, protective equipment (PPE), anchor points, access equipment and winches, for example.
Inspection before the end of the warranty
2 years after commissioning
Im Regelfall fällt die Prüfung vor Ende der Gewährleistung 2 Jahre nach Inbetriebnahme an, je nach vertraglicher Vereinbarung kann die Gewährleistung allerdings auch bis zu 5 Jahre betragen.
Fire-fighting equipment
Every 2 years
Marking/signage
Every 2 years
Lightning and surge protection
Every 2 years
A comprehensive inspection for lightning and surge protection is necessary every 2 years. A visual inspection of the earthing and lightning protection system should additionally be provided annually.
Periodic inspection WEA
Every 4 years
Electrical equipment DIN IEC 60364/DGUV V3
Every 4 years
Protective device testing
Every 4 years
Pressure equipment (ZüS) - Exchange
At commissioning and 10 years after commissioning
Continued operation
20 years after commissioning
Condition-based testing WEA
There are no set deadlines for the condition-based inspection. Please contact us for further information.